ANALISIS PENJADWALAN PROYEK DAN MITIGASI RISIKO TERHADAP PENINGKATAN KETEPATAN WAKTU PELAKSANAAN PROYEK KONSTRUKSI: STUDI LITERATUR

Alfin Dahlia Nahdlotul Khusna, Tri Kuncoro

Abstract


Timeliness in construction project implementation is one of the main indicators in determining project performance success. However, construction projects frequently experience schedule deviations due to weak initial planning, ineffective supervision, limited resource allocation, and the emergence of implementation risks. This study aims to analyze the contribution of project scheduling and risk mitigation in improving the timeliness of construction project completion through a literature study approach. The research method used is descriptive qualitative with systematic literature review techniques by synthesizing findings from scientific journals discussing Critical Path Method (CPM), Microsoft Project scheduling, Analytical Hierarchy Process (AHP), House of Risk (HOR), probability impact matrix, and integrated risk management. The results show that project scheduling has a strategic role in determining work sequences, identifying critical paths, allocating resources, and designing acceleration alternatives when delays occur. Meanwhile, risk mitigation acts as a preventive control against dominant delay factors such as financial instability, labor productivity decline, design changes, material shortages, managerial coordination failure, and external disturbances. The integration of adaptive scheduling systems and proactive risk mitigation has been shown to reduce schedule uncertainty, strengthen monitoring accuracy, and improve on-time completion performance. Therefore, the effectiveness of construction implementation can be significantly improved when project managers combine structured scheduling with comprehensive risk response planning.

Keywords: Project Scheduling; Risk Mitigation; Timeliness; Project Delays; Construction Management

Full Text:

PDF

References


Alviani, E., Putra, A. D., Siregar, A. M., & Usman, K. (2023). Manajemen Penjadwalan Menggunakan Microsoft Project dan Analisis Risiko pada Proyek Pembangunan RSPTN Universitas Lampung. Jurnal Rekayasa Sipil Dan Desain, 11(2), 255–264. https://doi.org/10.23960/jrsdd.v11i2.3130

Ayuza, F. (2025). Pengelolaan Manajemen Risiko Terintegrasi Dalam Tahapan Siklus Hidup Proyek Konstruksi Di Indonesia. Journal of Authentic Research, 4(Special Issue), 806–815. https://doi.org/10.36312/jar.v4ispecialissue.3335

Chandra, A. A., & Darmayanti, N. P. A. (2019). 肖沉 1, 2, 孙莉 1, 2∆, 曹杉杉 1, 2, 梁浩 1, 2, 程焱 1, 2. Tjyybjb.Ac.Cn, 27(2), 58–66.

Hidayat, M. R. B., & Sari, M. M. (2025). Faktor Keterlambatan Proyek Kontruksi Dengan Metode Analytical Hierarchy Process Di Kota Serang. Jurnal Gradasi Teknik Sipil, 9(2), 94–101.

K, A. R., Broto, A. B., & W, L. S. (2023). Aplikasi Metode House of Risk Sebagai Metode Konstruksi. 25(2), 103–112.

Kristanto, B. R., & Hariastuti, N. L. P. (2014). Aplikasi Model House of Risk (HOR) untuk Mitigasi Risiko pada Supply Chain Bahan Baku Kulit. Jurnal Ilmiah Teknik Industri, 13(2), 1–10.

Mustamin, M. R., Suleman, A. R., Djufri, H., Asrun, B., Mawarni, A. A. I., Fachriza, M., Putri, H., Tuwo, M., Sipil, T., Negeri, P., Pandang, U., Perintis, J., & Tamalanrea, K. (2023). Risiko Keterlambatan Waktu pada Pelaksanaan Proyek Pembangunan Bendungan Pamukkulu dengan Metode Matriks Risiko dan Metode AHP Bendungan Pamukkulu merupakan salah bertujuan untuk menyediakan pasokan air bersih , pembangkit listrik , dan manfaat yang Proye. 15, 145–158.

Razaque, A., Bach, C., salama, N., & Alotaibi, A. (2012). Fostering Project Scheduling and Controlling Risk Management. 3(14). http://arxiv.org/abs/1210.2021

Rifka Alkhilyatul Ma’rifat, I Made Suraharta, I. I. J. (2024). No Title 済無No Title No Title No Title. 2(2), 306–312.

Sebayang, E. M., Rahardjo, H. A., & Dinariana, D. (2018). Pengelolaan Risiko Proyek Gedung Bertingkat Pada PT. XYZ Di Jakarta terhadap Kinerja Waktu. Jurnal Teknik Sipil, 25(3), 229–236. https://doi.org/10.5614/jts.2018.25.3.8

Soetjipto, J. W., Qudsy, N. H., & Arifin, S. (2021). Analisis Risiko Keterlambatan Proyek Menggunakan Metode House of Risk. Journal of Applied Civil Engineering and Infrastructure Technology, 2(1), 19–26. https://doi.org/10.52158/jaceit.v2i1.149

Studi, P., Teknik, M., Tarumanagara, U., Studi, P., Teknik, M., & Tarumanagara, U. (2024). Latar belakang. 7(3), 907–914.

Studi Teknik Sipil, P., Permata Sari, K., Chairi, M., Yuda Trinanda, A., & Agrival, M. (2023). Jurnal Rivet (Riset dan Invensi Teknologi) PENILAIAN RISIKO KETERLAMBATAN PROYEK KONSTRUKSI (STUDI KASUS: GEDUNG DPRD KABUPATEN PASAMAN). Universitas Dharma Andalas, 03(02), 41.

Wijaya, C., Song, L. G., & Alifen, R. S. (2022). Antisipasi Keerlambatan Proyek dengan Metode Penjadwalan CPM. Dimensi Pratama Teknik Sipil, 22(2), 47–54.

Zali, S., Mulyani, R., & Anif, B. (2025). Analisis Risiko Penyebab Keterlambatan Pekerjaan Konstruksi Gedung. Jurnal Teknik Sipil ITP, 12(1), 9–17. https://doi.org/10.21063/JTS.2025.V1201.009-017


Refbacks

  • There are currently no refbacks.